|
|
|
- BIM EXECUTION PLAN (BEP)
|
|
> Initial tasks are carried out:
> Investigatión > Implementation > Design Concept > Volumetric surface stations and costs > The execution plan is established |
|
|
SKETCH
|
|
Drawings are produced, materials are selected, software and project lifecycle are defined..
|
|
|
MODEL
|
|
A collaborative 3D model that allows collecting and generating information, updating views and reducing corrections and iterations is generated.
|
|
|
TIME
|
|
The time variable is added to the model, allowing to understand and control the dynamics of the project execution.
|
|
|
COSTS
|
|
The unit prices are linked to the virtual model:
> Define the quantity of materials > Estimate the operating expenses |
|
|
GREEN BIM
|
|
Simulates the behavior of energy saving systems and resource management, this allows us to make better decisions before starting the construction.
|
|
|
MANAGEMENT
|
|
Generates tools to monitor the operation of the project, facilitating maintenance, inspections and repairs. It can be applied to projects in the planning phase, in development and in operation.
|
A form
intuitive of
schematize
the data
|
Adapting to the fourth industrial revolution, we have implemented within the company the BIM (Building Information Modeling), the Lean philosophy and new technologies to expedite processes, reduce losses, increase productivity and make more efficient the way of building within the public and private sector. |